LR Tech Park Progress Report #10

A big milestone was hit today with the front signage being hung as well as 415 Main Street being in the dry as the hole through the center section of the building has been closed.

The upper floors of 417 Main St. are prepping for carpet installation while the lower floors are being painted and finishing touches on conduit and other mechanicals. Pictures below include the decking of the new floor being built in 415 Main as they prepare for concrete.