LR TECH PARK PROGRESS REPORT #8

415 Main

The contractor has re-poured the footings for the new steel columns. The column steel is scheduled to be delivered on Wednesday. They have one footing left to pour between the 415 and 417 building and it is scheduled to be poured this afternoon.

417 Main

Framing continues on the first floor. Drywall has started. Sheetrock tape and float continues on the upper floors. Painting of the structure has started on the sixth floor.