LR TECH PARK PROGRESS REPORT #5

Entering month six on the Little Rock Technology Park project and the space is really starting to take shape. Drywall framing is in place and sheetrock is being hung. HVAC and plumbing equipment continues to get installed along with conduit and trays for the network.

The team at East Harding is dealing with some of the more structural issues in 415 and 417 Main St. including shoring the north wall of 415 Main, steel framing for the fire stair, portal between the two buildings and the additional elevator for 417 Main.